Electroswitch Rotary Switches

Results: 570
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Illuminated Number of Positions Number of Decks Number of Poles per Deck Current Rating Voltage Rating DC Voltage Rating AC Index Angle Contact Style Termination Style Mounting Type Contact Plating Actuator Series IP Rating Packaging
Electroswitch Rotary Switches 2P 5POS 30DEG ADJ NON-SHRT SLDR Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 2P 5POS 30DEG ADJ SHORTING, SOLDER LUG Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 2P 11POS 30DEG ADJ NON-SHRT SLDR Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 2P 11POS 30DEG ADJ SHORTING, SOLDER LUG Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 33.4mm 3 Pole 1.5 AMPS @ 28 VDC Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated 3 Position 1 Deck 3 Pole 1.5 A 28 VDC 30 deg Non-Shorting SMD/SMT Silver
Electroswitch Rotary Switches 3P 3POS 30DEG ADJ SHORTING, SOLDER LUG Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 3P 11POS 30DEG ADJ NON-SHRT SLDR Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 1.5A 28VDC 30deg 2-5 pos Non-shrting Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 4P 5POS 30DEG ADJ SHORTING, SOLDER LUG Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 02-03 POS/6 P/2 DECK Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated 3 Position 2 Deck 3 Pole 1.5 A 28 VDC 90 deg Non-Shorting Solder Lug Silver
Electroswitch Rotary Switches 02-03POS 6P/2SEC SHT Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated 3 Position 2 Deck 3 Pole 1.5 A 28 VDC 90 deg Shorting Solder Lug Silver
Electroswitch Rotary Switches 6P 5POS 30DEG ADJ NON-SHRT SLDR Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches 6P 5POS 30DEG ADJ SHORTING, SOLDER LUG Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D3
Electroswitch Rotary Switches ASSEMBLY Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Electroswitch Rotary Switches D4 Rotary Assembly 30deg, 2-12pos Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D4
Electroswitch Rotary Switches 2-12Pos 1P 30dg Shrtng, Deck Only Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D4
Electroswitch Rotary Switches 2-6Pos 1P 60dg NonShrt, Deck Only Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated Bulk
Electroswitch Rotary Switches 2-6Pos 2P 30dg NonShrt, Deck Only Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated 4 Position 2 Deck 2 Pole 1.5 A 28 VDC 125 VAC 30 deg Non-Shorting Solder Lug Panel Mount Silver
Electroswitch Rotary Switches 2-5Pos 3P 30dg Shrtng, Deck Only Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Electroswitch Rotary Switches 2-5Pos 3P 30dg NonShrt, Deck Only Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated 3 Position 1 Deck 1 Pole 1.5 A 28 VDC 125 VAC 30 deg Non-Shorting Solder Lug Panel Mount Silver
Electroswitch Rotary Switches 2-3Pos 5P 30dg Shrtng, Deck Only Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated D4
Electroswitch Rotary Switches 2Pos 6P 30dg NonShrt, Deck Only Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Electroswitch Rotary Switches 02-12POS/1P/1SECTION Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated 12 Position 1 Deck 1 Pole 1.5 A 28 VDC 125 VAC 30 deg Non-Shorting Solder Lug Silver
Electroswitch Rotary Switches ROTARY SWITCH 1 POLE 1.5A Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Non-Illuminated 1.5 A 28 VDC 125 VAC Shorting Silver
Electroswitch Rotary Switches 2Poles 02-06Pos 1Sec Non-Shorting Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Non-Illuminated